Prediction Market Funds

Rhine low water

Can one set of low-water markets give insurers a useful, shared forecast?

Low water can force Rhine barges to carry less, make more trips or wait. A shipper can face higher costs even before navigation stops. Kaub is a public gauge at a critical stretch of the river.

River gauges already inform insurance. Swiss Re uses named gauges for FLOW cover and documents a customer purchase. Its Kaub slide illustrates a payout below 60 cm. Descartes also assesses river-level risk from gauge data. Their methods and costs for this seasonal forecast are undisclosed.

For coverage tied to prolonged low water, an insurer needs to estimate the chance of different numbers of low-water days. Its own vessel, route, customer and policy analysis still matters. The public sources do not reveal what a matching seasonal forecast currently costs.

How the payout rises

An exchange could list ten YES/NO questions on this count. Trading would put a visible price on each severity threshold. Insurers could assess the same price curve alongside their own forecasts.

Count the July–November days when Kaub’s complete daily mean is strictly below 60 cm. Each question pays YES when the season has at least its stated number of days. The same ten markets cover every result from 0 through 153 days.

Hypothetical payout by low-water daysThe payout rises in ten equal 10% steps. The 2022 archive shows 17 days and a hypothetical 20% payout.0%50%100%0306090120153Low-water days at Kaub →
Frozen 2022 archive: 17 low-water days → 20% of the hypothetical maximum (2 of 10 YES markets). €20,000 on a €100,000 basket.

Modeled basket payout distribution

Give the whole season one illustrative chance of low water: at least one complete day with a Kaub mean below 60 cm. If that happens, use the selected day count as the most likely duration. A simple linear shape links the chances of all ten market questions.

Modeled chance of each basket payout
At a modeled 20% chance of low water, the selected 17-day scenario pays 20% of the maximum. The bars show the modeled chance of every possible basket payout.
Selected day-count payoutSimulated basket purchase cost: €26,500
Expected gross payout€8,893.75
Expected result after simulated cost-€17,606.25
Chance payout is below cost84.35%

These are hypothetical basket amounts before fees. The linear duration model is a teaching assumption, not an actuarial Kaub forecast. Simulated prices are separate inputs, not probabilities or live quotes.

See exact modeled payout chances
All eleven outcomes of the equal-weight basket
Payout shareHypothetical amountModeled chance
0%€080.15%
10%€10,0001.24%
20%€20,0002.96%
30%€30,0003.01%
40%€40,0003.26%
50%€50,0002.93%
60%€60,0002.51%
70%€70,0002.07%
80%€80,0001.35%
90%€90,0000.52%
100%€100,000under 0.01%

Simulated price of the equal-weight basket: €0.2650 per €1 of maximum payout. €26,500 at this limit, before fees.

The example prices fall as low-water duration becomes more severe. They show the required ordering of nested markets, not modeled probabilities or live quotes. Published CCNR Kaub history uses a different 78 cm threshold; it cannot price these July–November, below-60 cm questions. No public actuarial probability curve for these exact questions was identified.

See the ten market questions and edit simulated prices
One shared set of market questions; prices are invented examples
YES questionSimulated YES priceModeled YES chanceOutcomeEqual basket weight
At least 5 days?€0.400 simulated19.85%YES10% of the maximum payout
At least 14 days?€0.370 simulated18.61%YES10% of the maximum payout
At least 26 days?€0.340 simulated15.65%NO10% of the maximum payout
At least 39 days?€0.310 simulated12.65%NO10% of the maximum payout
At least 55 days?€0.280 simulated9.38%NO10% of the maximum payout
At least 72 days?€0.250 simulated6.45%NO10% of the maximum payout
At least 90 days?€0.220 simulated3.94%NO10% of the maximum payout
At least 110 days?€0.190 simulated1.88%NO10% of the maximum payout
At least 131 days?€0.160 simulated0.52%NO10% of the maximum payout
At least 153 days?€0.130 simulatedunder 0.01%NO10% of the maximum payout

Under five days, none pays. At 153 days, all ten pay. Each YES contract adds 10% to this illustrative basket; a buyer could weight these same markets differently. The modeled chances share one illustrative low-water duration distribution. Prices are neither insurance premiums nor automatically physical probabilities.

Why these bin sizes?

The ten thresholds are 5, 14, 26, 39, 55, 72, 90, 110, 131 and 153 days, calculated as ceil(153 × (i / 10)^(3/2)) for market i from 1 through 10. This makes bins wider as duration rises, while the equal-weight illustration changes payout by no more than 10% at one threshold. The spacing is provisional. It has not been fitted to shipping costs or insured losses. Fewer listed markets may concentrate trading, but their depth and usefulness have not been tested.

Download the full ladder method →

Who is the marginal buyer?

YES: Hedger

A reinsurer with low-water claims or a matching parametric obligation could buy YES to offset part of a large payout. So could a barge operator, a manufacturer dependent on river freight, or an individual whose income depends on river traffic. They would choose the thresholds and position size that fit their exposure. The contract pays when the gauge threshold is reached, whether or not that buyer suffers a loss.

NO: Speculator

A speculator who expects fewer low-water days than the market price suggests could buy NO. It pays when the threshold is not reached. River-level risk may offer returns driven by a different event than stocks, bonds or credit, which could help diversify a portfolio. That benefit depends on the price paid and the rest of the portfolio; low correlation has not been established for these proposed markets.

Could shared prices cut forecast costs?

If trading interest grows, the same public price curve could serve progressively more useful jobs. Each step depends on prices that can actually be traded at meaningful size.

Check a forecast

An insurer could compare market prices with its own low-water probabilities and investigate differences. Prediction-market research supports testing traded forecasts in other settings, while price-interpretation research shows why a market price is not automatically a physical probability. This check may initially add work.

Use prices in a model

With sustained depth and a record of accurate forecasts, prices could inform the hazard estimate used in quotes and updates. A Federal Reserve study shows how continuously updated rate-market forecasts can be compared with conventional estimates; it does not test Rhine risk. Spending falls only if a separable forecasting task can be reduced or retired while decision quality holds.

Transfer risk

With enough executable depth, an insurer could buy YES contracts that offset part of a matching parametric obligation. The NAIC describes how insurers transfer risk through capital markets; this is an analogy, not evidence that the proposed Rhine contracts would work. Basis risk, trading costs, collateral and legal terms would still need assessment.

Measure any forecasting saving against the cost of market access, integration, monitoring, validation, a retained fallback model and any liquidity support. Public evidence does not yet price either route for this exact forecast.

Method and evidence

Historical readings

These values were reconstructed from a later frozen archive. They do not establish what was available at each original settlement date.

Kaub low-water days and hypothetical equal-weight basket payouts
YearReadingYES marketsPayout share
20200 days0 of 100%
20210 days0 of 100%
202217 days2 of 1020%
20230 days0 of 100%
20240 days0 of 100%
20250 days0 of 100%

Download historical ladder results · CSV →

Source and settlement rules

The authoritative source is WSV PEGELONLINE’s Kaub archive. Each fixed-CET day requires 96 quarter-hour samples; a missing or conflicting sample makes that day unknown. A market is YES if confirmed low days reach its threshold, NO if even the maximum possible count stays below it, and otherwise unresolved.

The proposed source cutoff is December 8, Y at 12:00 UTC. Latest completed official response between December 7 12:00 and December 8 12:00 UTC, with matching metadata. No eligible response means unresolved. Correct source selection among eligible snapshots, transcription or calculation errors; preserve both snapshots and reason. Later provider revisions logged separately, without reopening. Identify frozen file, record, rule and proposed correction. All legs share corrected artifact. Source or interpretation issues can remain unresolved. A listing venue must decide how unresolved contracts are treated. These dates are proposed, not provider guarantees.

Download source identity and checksums → · Source-use notices →

Definitions and research downloads